Construction site monitoring platform based on point clouds: reduction of deviations, budget and schedule control
Measuring equipment
Individual sections and volumes of work are measured. The rest is estimated based on these measurements
Business trips of employees
It’s expensive so it happens infrequently, on remote costruction sites
Reports
of completion
Information on the types and volumes of work performed. Often can be inaccurate or submitted with delays

How is construction progress usually evaluated?

Drone surveillance

Track the work actually performed at the construction site
Archive of point clouds to monitor change trends
Point cloud comparison mode to visually assess the actual changes at the construction site
Measurement of lengths, angles, areas and volumes to verify contractors' reports

Schedules and cost estimates

Oversee the work schedule and project budget
Create construction schedules and cost estimates from scratch or import them from PM and takeoff software, respectively
End-to-end linking: objects tree, clouds, schedules and cost estimates
Create a daily progress chart based on the construction schedule
Monitor whether and how much work was performed

A simple solution to oversee all the processes of a construction project

Design documentation
2D/3D models
BIM
Drawings
Maps
Site plans
Construction schedule
Cost estimate

Start working in the system with any data set

The system accumulates all the information regarding the project, giving you a full-scale digital asset
Project documentation
Actual information
Point clouds
360° panoramic shots
Orthophotomaps
Video
Satellite images

Start working in the system with any data set

The system accumulates all the information regarding the project, giving you a full-scale digital asset
Project documentation
Actual information
1
Collect project data and import into the system
1st day
2
3D scene and objects tree preparation
2nd day
3
Link to cost estimates and schedules
3rd day
4
Full control over construction
Result

3 steps to start a project in NovoBIM

1
Collect project data and import into the system
1st day
2
3D scene and objects tree preparation
2nd day
3
Link to cost estimates and schedules
3rd day
4
Full control over construction
Result

3 steps to start a project in NovoBIM

1
Collect project data and import into the system
1st day
2
3D scene and objects tree preparation
2nd day
3
Link to cost estimates and schedules
3rd day
4
Full control over construction
Result

3 steps to start a project in NovoBIM

1
Collect project data and import into the system
1st day
2
3D scene and objects tree preparation
2 nd day
3
Link to cost estimates and schedules
3rd day
4
Full control over construction
Result

3 steps to start a project in NovoBIM

Monitor supply and consumption of construction materials
Track material consumption trends and standard delivery and storage periods
30% less cost for the work of surveyors
NovoBIM allows you to measure the geometry of an object (area, angles, distances) remotely
20% lower costs for correcting errors
Thanks to the tools for comparing the BIM model with point clouds, searching for inconsistencies takes as little as a few minutes
Easy oversight of contractors
Everything can be estimated in the system, including the quantity of builders and equipment, and the amount of work performed
2−3 times fewer team’s business trips
Business trips to the construction site are needed only at the most critical stages
6 times less time to update information
Save time with no field inspections or manual report preparation

Advantages of NovoBIM

Delineates details (elements of buildings or structures) in a common point cloud
Supplements the point cloud with attributive information regarding materials, sizes, and brands
Makes it possible to work with clouds as multicomponent information models
Serves as a link between clouds and other means of construction visualization, cost estimates, and construction schedules
Roof
Smoke exhaust hatch
Ventilation
Rooftop
Outer walls
Inner walls
Floorings
Partitions
Foundation
Basement
Flooring above the basement
Basement floor
Entrance lobby
Door panel
Semi-basement

NovoBIM works even if you don't have a BIM model

NovoBIM lets you manage construction even with a small amount of project data. For this an objects tree (OT) is built in the system. This is a model of the site in the form of an element tree containing attributive information on all the construction elements — from nuts to fittings.
OT purpose
Structural elements of a building

Submit a request for implementation

Tell us about your project and we will consult you on the cost and timelines